The master bath was phase 3 (of 3 and 1/2) and its now (mostly) done. We chopped off about 1/4 of the orignal attic-come-2nd floor. We already had some plumbing from the existing half bath which we used to feed a new shower and his and her vanities. At this point in the we were pretty over-the-top... the counter tops are actually an exotica African hardwood called bobinga and the shower and floors are a form of slate.